What gets placed for a factory
Automatic placement plan for this property type:
- Door / cashier / gateGate + securityfront zone with the highest combined score
- Long stay (desk, office)Owner + officeside or back with the strongest mountain star, no star 5
- Guests / customersDispatch + showroomfront zone with the strongest water star
- Fire / machines / noiseProduction lineyellow side/back zone, no star 5 or bad annual star
- Fire / machines / noiseBoiler + generatoryellow side/back zone, no star 5 or bad annual star
- Storage / stairsRaw materialslowest score, preferably at the back
- Toilet / septicToilets + wastelowest score, not at the front
Placement principles
- Gate and security post in the strongest front zone.
- Owner office at a side/back zone with a strong mountain star.
- Production line, boiler and generator in yellow zones without star 5 or bad annual stars.
- Toilets and waste in the lowest-scoring zones.
What you need
- Which way does the building face? How to measure the facing
- When was the building finished or majorly renovated? Period 9
- Personal good directions
Limits
Feng shui is a traditional belief without scientific evidence. Different schools can give different results, and results are not guaranteed. This report does not replace structural, legal or financial checks.
FAQ
What about a very large factory?
The 3×3 grid is laid over the whole site or main building. For complexes with several buildings, each building with its own entrance can be a separate reading.
Updated: 2026-11-18